Product Detail :
|
Operation and maintenance of phase-i & phase-ii system – to lift water from river godavari near gangaram (v), kannaiguden(m), mulugu district with 2.5 m dia pipeline from intake to r.s.ghanpur tank in four lifting, stages via bheemghanpur, pulkurthy and dharmasagar under phase-i and single pipeline of dia 3.0, 2.5, 2.0 m from intake to tapaspally tank via., bheemghanpur, salivagu, dharmasagar, gandhiramaram and bommakur in six stages and r.s. ghanpur to ashwaraopally tank in single stage from 01.06.2020 to 31.05.2022 (24 months).
|