Product Detail :
|
Drilling, excavation, loading, transportation, dumping, spreading & levelling etc., of 725.775 lbcm of in-situ ob (which includes 1.727 lbcm top soil, 3.454 lbcm sub soil, 683.807 lbcm hard ob and 40.241 lbcm coal) and re-handling of 10.075 lcm loose top soil with conventional equipment and additional works viz., 2000 shovel hours, 2000 dozer hours & 3,00,000 rmt drilling at mng ocp, mng area during a period of 42 months.
|