Product Detail :
|
Extraction of 23.50 LT of coal over a period of 6 APPs on cost per ton basis by deploying new Continuous Miner package as per the scope of the work, technical specification and other provisions indicated in the NIT at GDK11 incline, RG1 Area.
|