|
Product Detail :
|
Providing water spraying arrangement with 2 inch HDPE pipe line duly connecting the existing ash recovery water lines available on ash pond -2 and also engaging labour for water spraying over the deposited ash surface in Pond -2 to suppress the emission of ash at BTPS Ash Pond area for the summer season of 2026
|