|
Product Detail :
|
Manufacturing, supply, delivery, Lowering, Laying, jointing, Testing and commissioning for shifting of existing Ring Main-I of 1800mm dia MS water supply main line to facilitate the Construction of ROB at LC 246A, Ayodhya Nagar, Gundlapochampally under Lingampally section of SD II, Transmission Division No-IV, Control Room.
|