Product Detail :
|
Construction of lecture hall complex iii ground plus 3 floors on epc basis with civil works including internal water supply, and sanitary installations, sewerage system, drainage and development of site, internal roads, foothpath with kerbstone, storm water drains, external water supply lines, ug sump, septic tank, earth filling etc., and internal electrical installations, fans, fire fighting and fire alarm, central call bell system, lightining conductors, vrf ac systems, street lighting, Supply installation testing commissioning of lifts and horticulture works at hyderabad central university,
|